SMP20 Action Plan

This dashboard contains information about the SMP20 area, and data from our projects. For more information on our projects, click here.

1 Lavernock Point to Barry Island

Title
SMP Number
SMP
Policy Scenario Area
Policy Unit ID
Policy Unit Name (Location)
Action Reference
Action
Strategic or Non-Strategic
Action Theme
Local Authority
Action Lead
Action Lead Contact
Key Partner Organisations
Action Progress Status
Action Status Commentary
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 1 Lavernock Point to Barry Island
SMP 20 1.3
1.3 Swanbridge East
LP_01_10.1
Development of adaptation / resilience measures as defences continue to deteriorate and fail at Swanbridge, and if risk of coastal erosion to residential properties at Sully increases. Identify future risk of coastal erosion to coastal road users, and owners of residential properties at St Mary's Well Bay, holiday park and properties at Lavernock Point.
Strategic
Adaptation/Resilience
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
NRW
On Hold
On Hold - resource constraints VGC (10/2022) - VoG to review coastal strategy. Defence is deteriorating but options for alternative access not economically viable. Policy may need to be changed.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 1 Lavernock Point to Barry Island
SMP 20 1.5
1.5 Sully to Bendrick Rock (including Sully Island)
LP_01_10.1
Development of adaptation / resilience measures as defences continue to deteriorate and fail at Swanbridge, and if risk of coastal erosion to residential properties at Sully increases. Identify future risk of coastal erosion to coastal road users, and owners of residential properties at St Mary's Well Bay, holiday park and properties at Lavernock Point.
Strategic
Adaptation/Resilience
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
NRW
On Hold
On Hold - resource constraints VGC (10/2022) - VoG to review coastal strategy. Defence is deteriorating but options for alternative access not economically viable. Policy may need to be changed.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 1 Lavernock Point to Barry Island
SMP 20 1.4
1.4 Swanbridge West
LP_01_10.1
Development of adaptation / resilience measures as defences continue to deteriorate and fail at Swanbridge, and if risk of coastal erosion to residential properties at Sully increases. Identify future risk of coastal erosion to coastal road users, and owners of residential properties at St Mary's Well Bay, holiday park and properties at Lavernock Point.
Strategic
Adaptation/Resilience
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
NRW
On Hold
On Hold - resource constraints VGC (10/2022) - VoG to review coastal strategy. Defence is deteriorating but options for alternative access not economically viable. Policy may need to be changed.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 1 Lavernock Point to Barry Island
SMP 20 1.2
1.2 St Mary's Well Bay to Swanbridge
LP_01_2.1
Undertake community engagement to develop coastal erosion and flood risk management plans which are ideally supported by the local community . This will involve consideration of alternative coastal erosion and flood risk management options (including wide ranging adaptation options) and alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management. Issues to be considered may include: the access road to Swanbridge East, holiday parks at Lavernock Point and St Mary's Well Bay and residential properties at St Mary's Well Bay, improved flood warning, individual property flood protection/resilience, relocation of properties, provision of an alternative access road to Swanbridge East and other adaptation and mitigation measures.
Non-Strategic
Community Engagement
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
On Hold
On Hold - resource constraints VGC (10/2022) - VoG to review coastal strategy. Defence is deteriorating but options for alternative access not economically viable. Policy may need to be changed
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 1 Lavernock Point to Barry Island
SMP 20 1.4
1.4 Swanbridge West
LP_01_2.1
Undertake community engagement to develop coastal erosion and flood risk management plans which are ideally supported by the local community . This will involve consideration of alternative coastal erosion and flood risk management options (including wide ranging adaptation options) and alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management. Issues to be considered may include: the access road to Swanbridge East, holiday parks at Lavernock Point and St Mary's Well Bay and residential properties at St Mary's Well Bay, improved flood warning, individual property flood protection/resilience, relocation of properties, provision of an alternative access road to Swanbridge East and other adaptation and mitigation measures.
Non-Strategic
Community Engagement
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
On Hold
On Hold - resource constraints VGC (10/2022) - VoG to review coastal strategy. Defence is deteriorating but options for alternative access not economically viable. Policy may need to be changed
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 1 Lavernock Point to Barry Island
SMP 20 1.1
1.1 Lavernock Point to St Mary's Well Bay
LP_01_2.1
Undertake community engagement to develop coastal erosion and flood risk management plans which are ideally supported by the local community . This will involve consideration of alternative coastal erosion and flood risk management options (including wide ranging adaptation options) and alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management. Issues to be considered may include: the access road to Swanbridge East, holiday parks at Lavernock Point and St Mary's Well Bay and residential properties at St Mary's Well Bay, improved flood warning, individual property flood protection/resilience, relocation of properties, provision of an alternative access road to Swanbridge East and other adaptation and mitigation measures.
Non-Strategic
Community Engagement
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
On Hold
On Hold - resource constraints VGC (10/2022) - VoG to review coastal strategy. Defence is deteriorating but options for alternative access not economically viable. Policy may need to be changed
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 1 Lavernock Point to Barry Island
SMP 20 1.3
1.3 Swanbridge East
LP_01_2.1
Undertake community engagement to develop coastal erosion and flood risk management plans which are ideally supported by the local community . This will involve consideration of alternative coastal erosion and flood risk management options (including wide ranging adaptation options) and alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management. Issues to be considered may include: the access road to Swanbridge East, holiday parks at Lavernock Point and St Mary's Well Bay and residential properties at St Mary's Well Bay, improved flood warning, individual property flood protection/resilience, relocation of properties, provision of an alternative access road to Swanbridge East and other adaptation and mitigation measures.
Non-Strategic
Community Engagement
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
On Hold
On Hold - resource constraints VGC (10/2022) - VoG to review coastal strategy. Defence is deteriorating but options for alternative access not economically viable. Policy may need to be changed
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 1 Lavernock Point to Barry Island
SMP 20 1.4
1.4 Swanbridge West
LP_01_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 1 Lavernock Point to Barry Island
SMP 20 1.3
1.3 Swanbridge East
LP_01_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
All
LP_01_8.3
Promote the inclusion of the SMP policies and flood and coastal erosion risks in the next revisions of local development plans in order to help manage residual risks from coastal erosion and flooding to inform future planning decisions.
Strategic
Planning
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 2 Barry Island and Dock
SMP 20 2.1
2.1 Barry Docks (Bendrick Rock to West Breakwater)
LP_02_2.2
Engage with and encourage ABP to undertake a study to identify the current and future risk of coastal erosion and flooding to Barry docks and associated infrastructure to enable long term sustainable flood and coastal erosion risk management plan to be developed for the site. Ensure that any future management plans to Barry Docks are monitored and used to inform and, where appropriate, update the SMP. Consider alternative funding options.
Non-Strategic
Asset Management
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
Challenged - unclear action 10/2022 - Action requires modification. Engagement and incorporation of findings would be led by VoGC with ABP as key partner. Delivery of study would need to be led by ABP, with VOG and NRW as key partners.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 2 Barry Island and Dock
SMP 20 2.3
2.3 Whitmore Bay, Barry Island
LP_02_2.7
Undertake a scoping study to gauge the feasibility of managed realignment in Whitmore Bay, including community engagement, economic appraisal (including consideration of alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management) and investigating likely impacts on beach evolution. Should the study indicate that this policy is not appropriate, investigate feasibility of continuing to hold the existing line which may involve consideration of alternative and wide ranging adaptation options. Develop a coastal erosion and flood risk management plan, which is ideally supported by the local community.
Strategic
Strategy Work
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 2 Barry Island and Dock
SMP 20 2.3
2.3 Whitmore Bay, Barry Island
LP_02_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Strategic
Community Engagement
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 3 The Knap to Watch House Beach
SMP 20 3.1
3.1 The Knap (Cold Knap Point to Bull Cliff)
LP_03_2.1
Undertake a study to investigate the feasibility of managed realignment at The Knap which will include: community engagement, consideration of the defence function of the shingle ridge, predicting future development of the shingle ridge, whether the construction of secondary defences is necessary to manage the risk of coastal erosion and flooding to properties inshore, consideration of current management and future management of surface water drainage and investigating alternative funding options. Consider alternative options where it is not possible to justify public investment in coastal erosion and flood risk management.
Strategic
Strategy Work
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
On Hold - delivery constraints VGC (10/2022) - This will need considerable resourcing and consultation.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 3 The Knap to Watch House Beach
SMP 20 3.1
3.1 The Knap (Cold Knap Point to Bull Cliff)
LP_03_5.2
Undertake detailed monitoring programme of the shingle ridge, its function as a defence and likelihood of a breach.
Non-Strategic
Asset Management
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Wales Coastal Monitoring Centre
Progressing
VGC (10/2022) - Coastal monitoring being undertaken by WCMC. Surveys currently in process awaiting results.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 3 The Knap to Watch House Beach
SMP 20 3.2
3.2 Bull Cliff
LP_03_5.3
Undertake detailed monitoring programme of the shingle ridge, its function as a defence and likelihood of a breach.
Non-Strategic
Asset Management
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Wales Coastal Monitoring Centre
Progressing
VGC (10/2022) - Coastal monitoring being undertaken by WCMC. Surveys currently in process awaiting results.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 3 The Knap to Watch House Beach
SMP 20 3.1
3.1 The Knap (Cold Knap Point to Bull Cliff)
LP_03_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 4 Aberthaw
SMP 20 4.1
4.1 Aberthaw
LP_04_2.1
Engage with and encourage RWE to undertake a study to identify the current and future risk of coastal erosion and flooding to the Aberthaw power station site and associated infrastructure to enable long term sustainable flood and coastal erosion risk management plan to be developed.
Non-Strategic
Asset Management
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 5 Limpert Bay to Nash Point
SMP 20 5.2
5.2 Llantwit Major (Cwm Col-huw)
LP_05_2.2
Undertake a scoping study to gauge the technical, socio-economic and environmental viability of a coastal erosion and flood risk management plan which may involve further managed realignment at Llantwit Major to enable the creation of an area of inter-tidal habitat. Consider alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management.
Strategic
Strategy Work
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 5 Limpert Bay to Nash Point
SMP 20 5.2
5.2 Llantwit Major (Cwm Col-huw)
LP_05_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Vale of Glamorgan
Vale of Glamorgan Council
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 6 Nash Point to Porthcawl
SMP 20 6.2
6.2 Ogmore River to Newton (Merthyr Mawr)
LP_06_2.1
Develop a management strategy for Merthyr Mawr dunes to enable this largely undeveloped and extensive dune system to respond and evolve naturally whilst recognising the possible need to managed visitor pressure. Identify and confirm management objectives and triggers for intervention.
Bridgend
Bridgend County Council
Vale of Glamorgan Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 7 Porthcawl to Sker Point
SMP 20 7.2
7.2 Newton Point to Rhych Point (Trecco Bay)
LP_07_2.2
Engage with landowners to ensure future development of Trecco Bay includes defence improvements which should be developed to manage the risk of coastal erosion to this site whilst minimising impacts alongshore.
Non-Strategic
Community Engagement
Bridgend
Bridgend County Council
Progressing
10/22 - ongoing discussions with private landowners BCBC regeneration/ planning departments as part of latest revision to BCBC LDP
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 7 Porthcawl to Sker Point
SMP 20 7.5
7.5 Hutchwns Point to Sker Point (Rest Bay)
LP_07_2.5
Subject to the availability of funding develop a long term sustainable flood and coastal erosion risk management plan for coastal assets within Rest Bay including the lifeguard station, slipway and access road.
Strategic
Asset Management
Bridgend
Bridgend County Council
Not Yet Started
On Hold - funding constraints 10/22 - BCBC;Awaiting funding scheme
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 7 Porthcawl to Sker Point
SMP 20 7.5
7.5 Hutchwns Point to Sker Point (Rest Bay)
LP_07_2.6
Engage with the privately owned Royal Porthcawl links golf course to develop a long term sustainable flood and coastal erosion risk management plan for assets which are at risk of future coastal erosion.
Non-Strategic
Community Engagement
Bridgend
Bridgend County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 7 Porthcawl to Sker Point
SMP 20 7.1
7.1 Newton
LP_07_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Bridgend
Bridgend County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
All
LP_07_8.3
Promote the inclusion of the SMP policies and flood and coastal erosion risks in the next revisions of local development plans in order to help manage residual risks from coastal erosion and flooding to inform future planning decisions.
Strategic
Planning
Bridgend
Bridgend County Council
Progressing
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 8 Sker Poin to Swansea Dock
SMP 20 8.2
8.2 Port Talbot steelworks
LP_08_2.1
Engage with and encourage Tata Steel to undertake a study to identify the current and future risk of coastal erosion and flooding to Port Talbot steelworks and associated infrastructure to enable a long-term sustainable flood and coastal erosion risk management plan to be developed for the site. This should include a study into the nature of the potentially contaminated land which is potentially at risk from coastal erosion. Ensure that any future management plans are monitored and used to inform and, where appropriate, update the SMP.
Strategic
Community Engagement
Neath Port Talbot
Neath Port Talbot Council
On Hold
On Hold - resource constraints
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 8 Sker Poin to Swansea Dock
SMP 20 8.3
8.3 Port of Port Talbot (including River Avan)
LP_08_2.2
Engage with and encourage ABP to undertake a study to identify the current and future risk of coastal erosion and flooding to the Port of Port Talbot and associated infrastructure to enable long-term sustainable flood and coastal erosion risk management plan to be developed for the site. Ensure that any future management plans for the Port of Port Talbot including future maintenance dredging are monitored and used to inform and, where appropriate, update the SMP.
Strategic
Community Engagement
Neath Port Talbot
Neath Port Talbot Council
On Hold
Challenged - unclear action 10/2022 - Action requires modification. Engagement and incorporation of findings would be led by VoGC with ABP as key partner. Delivery of study would need to be led by ABP, with VOG and NRW as key partners.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 8 Sker Poin to Swansea Dock
SMP 20 8.8
8.8 Former BP tank farm
LP_08_2.5
Engage with and encourage landowners to undertake studies to identify the impacts of the Bay Science and Innovation Campus development on the adjacent environmentally designated area of Crymlyn Burrows and potential impacts of future climate change. The potential risk of outflanking of the development from the undefended frontage to the east also needs to be considered and addressed.
Non-Strategic
Asset Management
Neath Port Talbot
Neath Port Talbot Council
City and County of Swansea
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 8 Sker Poin to Swansea Dock
SMP 20 8.6
8.6 Neath Estuary
LP_08_2.6
Engage with the Neath Estuary Group to ascertain the management intent for the Neath Estuary area and its associated infrastructure. Ensure that any future management plans are monitored and used to inform and, where appropriate, update the SMP.
Strategic
Asset Management
Neath Port Talbot
Neath Port Talbot Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
All
LP_08_8.3
Promote the inclusion of the SMP policies and flood and coastal erosion risks in the next revisions of local development plans in order to help manage residual risks from coastal erosion and flooding to inform future planning decisions.
Strategic
Planning
Neath Port Talbot
Neath Port Talbot Council
Progressing
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 9 Swansea Bay
SMP 20 9.1
9.1 Swansea Docks and Channel
LP_09_2.2
Engage with and encourage ABP to undertake a study to identify the current and future risk of coastal erosion and flooding to the Port of Swansea and associated infrastructure to enable a long-term sustainable flood and coastal erosion risk management plan to be developed and implemented for the site.
Non-Strategic
Asset Management
Swansea
City and County of Swansea
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
All
LP_09_8.3
Promote the inclusion of the SMP policies and flood and coastal erosion risks in the next revisions of local development plans in order to help manage residual risks from coastal erosion and flooding to inform future planning decisions.
Strategic
Planning
Swansea
City and County of Swansea
Progressing
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 11 Worms Head to Whiteford Point
SMP 20 11.4
11.4 Twlc Point to Hills Tor (Broughton Bay)
LP_11_2.2
Engage with existing asset owners in developing a management plan for Broughton Bay and Hill end caravan park and camp site (which would consider removal of existing defences if they're shown to have an adverse effect) to identify the risk of coastal flooding and flooding from other potential sources (i.e. surface water flooding, run-off from adjacent agricultural areas) and to develop suitable mitigation measures.
Non-Strategic
Asset Management
Swansea
City and County of Swansea
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.13
12.13 Burry Port Marina to The Nose
LP_12_2.10
Develop managed realignment scheme between Burry Port Marine and the Nose.
Non-Strategic
Habitat Creation
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
On Hold - delivery constraints CCC (12/2022); Not progressing currently as the predominant process is deposition
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.2
12.2 Crofty to Penclawdd
LP_12_2.2
Develop a Flood Consequences Assessment for Penclawdd to consider the risk of flooding from sources other than tidal, such as surface water and ground water and develop options to reduce this risk.
Non-Strategic
Swansea
City and County of Swansea
NRW
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.10
12.10 Pwll railway frontage (Llanelli Beach to Tywyn B�ch)
LP_12_2.4
Undertake a study into the nature of the potential contaminated land between Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Works being undertaken at Burry Port
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.8
12.8 Wildfowl and Wetlands Centre to Penrhyn Gwyn
LP_12_2.4
Undertake a study into the nature of the potential contaminated land between Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Works being undertaken at Burry Port
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.12
12.12 Burry Port west (the slipway to Burry Port Marina)
LP_12_2.4
Undertake a study into the nature of the potential contaminated land between Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Works being undertaken at Burry Port
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.7
12.7 Morfa Bacas (Loughor Bridge to Wildfowl and Wetlands Centre)
LP_12_2.4
Undertake a study into the nature of the potential contaminated land between Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Works being undertaken at Burry Port
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.11
12.11 Burry Port east (Tywyn B�ch to the Slipway)
LP_12_2.4
Undertake a study into the nature of the potential contaminated land between Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Works being undertaken at Burry Port
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.9
12.9 Machynys (Penrhyn Gwyn) to the northern end of Llanelli Beach
LP_12_2.4
Undertake a study into the nature of the potential contaminated land between Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Works being undertaken at Burry Port
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.13
12.13 Burry Port Marina to The Nose
LP_12_2.4
Undertake a study into the nature of the potential contaminated land between Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Works being undertaken at Burry Port
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.7
12.7 Morfa Bacas (Loughor Bridge to Wildfowl and Wetlands Centre)
LP_12_2.5
Develop managed realignment scheme at Morfa Bacas.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Footpath diversion underway with associated Planning app and, land transfer etc being progressed.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.7
12.7 Morfa Bacas (Loughor Bridge to Wildfowl and Wetlands Centre)
LP_12_2.6
Undertake a Strategic Flood Consequences Assessment for Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Level-1 SFCA draft complete, Stage-2 and 3 to follow
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 2.9
12.9 Machynys (Penrhyn Gwyn) to the northern end of Llanelli Beach
LP_12_2.6
Undertake a Strategic Flood Consequences Assessment for Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Level-1 SFCA draft complete, Stage-2 and 3 to follow
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.8
12.8 Wildfowl and Wetlands Centre to Penrhyn Gwyn
LP_12_2.6
Undertake a Strategic Flood Consequences Assessment for Llanelli and Burry Port.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Progressing
CCC (05/12/2022); Level-1 SFCA draft complete, Stage-2 and 3 to follow
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.12
12.12 Burry Port west (the slipway to Burry Port Marina)
LP_12_2.8
Undertake modelling to investigate future development in bathymetry and the sand spit at the entrance to Burry Port marina to enable development and assessment of alternative options to maintain a navigable channel to the marina as part of the consideration of the future evolution of the Carmarthen Bay and the Loughor Estuary.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
City and County of Swansea
Not Yet Started
On Hold - resource contraints 10/2022 SCBCEG; No change since 2020. Action linked to wider Carmarthen Bay and estuaries action identified as a priority (6th of 6) by coastal group. Delivery of action highly dependent on collection of appropriate monitoring data. At present a comprehensive data collection programme has not been scoped and should be considered as a new action for delivery in Epoch 2 or given appropriate management triggers. The current WCMC programme is not funded to deliver datasets covering the entire system, e.g. bathymetric data and LiDAR, as part of a strategic monitoring programme. The Pan-Wales LiDAR programme currently being flown may provide a baseline but further repeat surveys will be required to determine change within the system. Additional site specific monitoring at shorter temporal and spatial scales may also be required. The coastal group considers the ongoing development of a comprehensive monitoring programme critical to support future delivery of this objective.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20
All
LP_12_5.5
Undertake annual LIDAR survey and vertical aerial photography of the entire estuarine system (undertaken as quickly as possible during a single period of low spring tides) to provide a consistent data set for a particular date (which can be effectively compared to subsequent date sets) to enable efficient monitoring of variations in the alignment of low water channels and sand banks, intertidal mudflats and salt marshes. Link with regular bathymetric surveys, in particular of the offshore areas of Carmarthen Bay and Three Rivers estuarine complex.
Non-Strategic
Coastal Monitoring
Swansea
Wales Coastal Monitoring Centre
Coastal Group - SCBCEG
Not Yet Started
SCBCEG (10/2022); Action assessed as lower priority by group. Pan-Wales LiDAR flight currently nearing completion will capture drying areas but no plans at present to capture nadir aerial imagery. No regular bathymetric surveys currently being delivered via the WCMC monitoring programme. WCMC considered more approriate lead organisation to coordinate delivery.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20
All
LP_12_5.5
Undertake annual LIDAR survey and vertical aerial photography of the entire estuarine system (undertaken as quickly as possible during a single period of low spring tides) to provide a consistent data set for a particular date (which can be effectively compared to subsequent date sets) to enable efficient monitoring of variations in the alignment of low water channels and sand banks, intertidal mudflats and salt marshes. Link with regular bathymetric surveys, in particular of the offshore areas of Carmarthen Bay and Three Rivers estuarine complex.
Non-Strategic
Coastal Monitoring
Carmarthenshire
Wales Coastal Monitoring Centre
Coastal Group - SCBCEG
Not Yet Started
SCBCEG (10/2022); Action assessed as lower priority by group. Pan-Wales LiDAR flight currently nearing completion will capture drying areas but no plans at present to capture nadir aerial imagery. No regular bathymetric surveys currently being delivered via the WCMC monitoring programme. WCMC considered more approriate lead organisation to coordinate delivery.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.7
12.7 Morfa Bacas (Loughor Bridge to Wildfowl and Wetlands Centre)
LP_12_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Carmarthenshire
Carmarthenshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 12 Loughor Estuary
SMP 20 12.13
12.13 Burry Port Marina to The Nose
LP_12_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Carmarthenshire
Carmarthenshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 13 Pembrey Burrows
SMP 20 13.1
13.1 Pembrey Sands (The Nose to South of Tywyn Point)
LP_13_2.2
Engage with and encourage the RAF Pembrey Sands Air Weapons Range to undertake a feasibility study to consider the potential impacts under a range of future climate change/ sea level rise scenarios to inform the development of suitable adaptation and mitigation measures which may include flood resilience, flood protection or relocation of assets.
Non-Strategic
Asset Management
Carmarthenshire
Carmarthenshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
All
LP_13_8.3
Promote the inclusion of the SMP policies and flood and coastal erosion risks in the next revisions of local development plans in order to help manage residual risks from coastal erosion and flooding to inform future planning decisions.
Strategic
Planning
Carmarthenshire
Carmarthenshire County Council
Progressing
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 14 Three River Estuarine Complex
SMP 20 14.18
14.18 Laugharne
LP_14_2.3
Undertake community engagement and detailed studies to investigate the technical, environmental and socio-economic implications of a range of managed realignment schemes along these frontages, which need to take full account of potential future climate change and identify potential wider impacts on the estuarine system.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Not Yet Started
On Hold - funding constraints Need to liase with NRW on how to progress this
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 14 Three River Estuarine Complex
SMP 20 14.19
14.19 South of Laugharne to Ginst Point
LP_14_2.3
Undertake community engagement and detailed studies to investigate the technical, environmental and socio-economic implications of a range of managed realignment schemes along these frontages, which need to take full account of potential future climate change and identify potential wider impacts on the estuarine system.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Not Yet Started
On Hold - funding constraints Need to liase with NRW on how to progress this
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 14 Three River Estuarine Complex
SMP 20 14.15
14.15 River Taf Eastern Bank (Black Scar to St Clears)
LP_14_2.3
Undertake community engagement and detailed studies to investigate the technical, environmental and socio-economic implications of a range of managed realignment schemes along these frontages, which need to take full account of potential future climate change and identify potential wider impacts on the estuarine system.
Non-Strategic
Carmarthenshire
Carmarthenshire County Council
NRW
Not Yet Started
On Hold - funding constraints Need to liase with NRW on how to progress this
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 14 Three River Estuarine Complex
SMP 20 14.19
14.19 South of Laugharne to Ginst Point
LP_14_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Carmarthenshire
Carmarthenshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 15 Ginst Point to Dolwen Point
SMP 20 15.1
15.1 Pendine Burrows (Ginst Point to Pendine village east)
LP_15_2.1
Develop management strategy for the QinetiQ weapons testing and evaluation facility within Pendine Burrows dunes to confirm management objectives and triggers for intervention, in order to confirm the best approach to deliver the managed realignment policy. Consider future development of the adjacent estuarine system and dune system as a result of future climate change/ sea level rise and assess alternative adaptation measures such as asset level flood protection, resistance or resilience measures or asset relocation in order to develop a technically, socio-economically and environmentally viable solution for the facility which is sustainable in the long term.
Strategic
Asset Management
Carmarthenshire
Qinetiq
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 15 Ginst Point to Dolwen Point
SMP 20 15.2
15.2 Pendine village
LP_15_2.2
Undertake a scoping assessment to identify when a feasibility study of the upgrading/improvement options to existing defences needs to be carried out/or identify the criteria/factors that would trigger this feasibility study. The timing of this feasibility study will be influenced by factors such as: existing frequency of flooding, risk of coastal erosion, type of receptors at risk, depths and velocity of flooding, residual asset life and consideration of alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management.
Non-Strategic
Asset Management
Carmarthenshire
Carmarthenshire County Council
Not Yet Started
On Hold - resource constraints CCC (05/12/2022); Not currently progressing
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 15 Ginst Point to Dolwen Point
SMP 20 15.2
15.2 Pendine village
LP_15_2.3
Complete study to assess the technical, socio-economic and environmental viability of alternative options for future coastal erosion and flood risk management at Pendine village which include consideration of managed realignment options and wider redevelopment including tourist/amenity recreation elements. Assessment should include consideration of the potential opportunities and impacts of alternative solutions on Pendine Burrows. It is recommended that community engagement is undertaken at the early stages of this study. Consider alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management.
Strategic
Asset Management
Carmarthenshire
Carmarthenshire County Council
Progressing
CCC (05/12/2022); The work of the CCC economic Development Team will be adsorbed in the FRMP2 and then prioritised accordingly, on a risk based basis.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 15 Ginst Point to Dolwen Point
SMP 20 15.2
15.2 Pendine village
LP_15_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Carmarthenshire
Carmarthenshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 16 Dolwen Point to Giltar Point
SMP 20 16.12
16.12 The Burrows, Tenby South Beach
LP_16_2.8
Engage with and encourage the Golf Club to develop a management strategy for Tenby South Beach dunes to confirm management objectives and triggers for intervention, in order to confirm the best approach to deliver the managed realignment policy.
Non-Strategic
Community Engagement
Pembrokeshire
Pembrokeshire County Council
Progressing
On Hold - delivery constraints PCC have engaged with the golf club due high due erosion where there is an active part of the golf course. Golf club have appointed consultants to reconfigure the golf course. Golf club have submitted a planning application to the PCNPA to install time limited gabions in the location of high erosion.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 16 Dolwen Point to Giltar Point
SMP 20 16.7
16.7 Saundersfoot
LP_16_2.9
Undertake a scoping assessment to identify when a feasibility study of the upgrading/improvement options to existing defences needs to be carried out/or identify the criteria/factors that would trigger this feasibility study. The timing of this feasibility study will be influenced by factors such as: existing frequency of flooding, risk of coastal erosion, type of receptors at risk, depths and velocity of flooding, residual asset life and consideration of alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management.
Non-Strategic
Asset Management
Pembrokeshire
Pembrokeshire County Council
Pembrokeshire Coast National Park Authority
Progressing
On Hold - resource constraints RHDVH completed flood maping of some of the areas at risk. Further work needed.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 16 Dolwen Point to Giltar Point
SMP 20 16.4
16.4 Wiseman's Bridge
LP_16_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Pembrokeshire
Pembrokeshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 16 Dolwen Point to Giltar Point
SMP 20 16.5
16.5 Wiseman's Bridge to Coppet Hall
LP_16_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Pembrokeshire
Pembrokeshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 16 Dolwen Point to Giltar Point
SMP 20 16.2
16.2 Amroth
LP_16_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Pembrokeshire
Pembrokeshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 16 Dolwen Point to Giltar Point
SMP 20 16.7
16.7 Saundersfoot
LP_16_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Pembrokeshire
Pembrokeshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
All
LP_16_8.3
Promote the inclusion of the SMP policies and flood and coastal erosion risks in the next revisions of local development plans in order to help manage residual risks from coastal erosion and flooding to inform future planning decisions.
Strategic
Planning
Pembrokeshire
Pembrokeshire County Council
Progressing
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 17 Giltar Point to St Govan's Head
SMP 20 17.4
17.4 Freshwater East
LP_17_2.2
Develop management strategy for Freshwater East dunes to confirm management objectives and triggers for intervention, in order to confirm the best approach to deliver the managed realignment policy. Confirm the best approach to deliver the managed realignment policy.
Strategic
Pembrokeshire
Pembrokeshire County Council
Pembrokeshire Coast National Park Authority
Not Yet Started
On Hold - delivery constraints (27/07/23 PCNPA) The Authority does not have any current plans to produce a strategy to manage realignment of this stretch of coast but rather allow it to be reshaped by natural processes.There are private houses and land within the dunes not owned by the National Park Authority and the owners of these properties may wish to develop their own defences. Any managed realignment strategy is a coastal defence matter and therefore under PCC control.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 17 Giltar Point to St Govan's Head
SMP 20 17.2
17.2 Lydstep
LP_17_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Pembrokeshire
Pembrokeshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 18 St Govan's Head to Thorn Island
SMP 20 18.3
18.3 Frainslake Sands and Freshwater West
LP_18_2.1
Develop a long term sustainable management strategy for Fairnslake Sands and Freshwater West (Brownslade, Kilpaison and Broomhill Burrows dunes) in response to a range of future climate change scenarios and in liaison with all key stakeholders, specifically Pembrokeshie County Council. This will involve developing management objectives and triggers for adaptation, and the development and assessment of alternative options to identify the best approach to deliver the managed realignment policy.
Strategic
Strategy Work
Pembrokeshire
National Trust
Pembrokeshire County Council
Not Yet Started
On Hold - delivery constraints (27/07/23) To the north it is affected a track providing access to private properties. To the south the land is occupied by PCC public toilets. The responsibilities to maintain this frontage outside of the car park is a matter for PCC as coastal defence authority.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 19 Thorn Island to Cleddau Bridge
SMP 20 19.2
19.2 Angle Bay (Angle Point to Sawdern Point)
LP_19_2.1
Undertake assessment of the future risk of coastal erosion and flooding at Angle Bay to inform the development and assessment of alternative adaptation measures to existing properties and assets which may include improved flood warning, flood protection measures, flood resilience measures or relocation of assets. Community of engagement will be undertaken to identify alternative coastal erosion and flood risk management options (including wide ranging adaptation options) and alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management.
Strategic
Strategy Work
Pembrokeshire
Pembrokeshire County Council
NRW
Progressing
Flood mapping completed with RHDHV. Community consulation to be carried out.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 19 Thorn Island to Cleddau Bridge
SMP 20
All
LP_19_5.6
Engage with and encourage the landowners to monitor the risk to the oil refinery and encourage intervention is undertaken as necessary as part of their risk assessment process, to continue to manage the risk of coastal erosion to these assets and the potential risk of contamination to the Haven.
Non-Strategic
Asset Management
Pembrokeshire
Pembrokeshire County Council
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 20 Cleddau Bridge to Little Castle Head
SMP 20 20.4
20.4 Milford Haven (Newton Noyes Pier to Fort Hubberston)
LP_20_2.5
Engage with the landowner to remain informed about any proposed development at Blackbridge.
Non-Strategic
Community Engagement
Pembrokeshire
Pembrokeshire County Council
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 20 Cleddau Bridge to Little Castle Head
SMP 20 20.6
20.6 Gelliswick Bay
LP_20_2.6
Undertake a feasibility study at Gelliswick Bay to identify suitable adaption measures for properties and assets at risk, following failure of existing defences. Community engagement will be undertaken to identify alternative coastal erosion and flood risk management options (including wide ranging adaptation options) and alternative funding options where it is not possible to justify public investment in coastal erosion and flood risk management.
Non-Strategic
Pembrokeshire
Pembrokeshire County Council
NRW
On Hold - delivery constraints On Hold due to delivery, funding and resource constraints.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 20 Cleddau Bridge to Little Castle Head
SMP 20 20.3
20.3 Hazelbeach to Newton Noyes Pier
LP_20_5.2
Engage with and encourage the landowner to set up a specific programme to monitor the risk of coastal erosion to the oil storage facility (20.3) and LNG terminals (20.3 and 20.7) as part of their risk assessment process.
Non-Strategic
Asset Management
Pembrokeshire
Pembrokeshire County Council
Not Yet Started
Proposed change in lead organisation to private asset/land owners.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 20 Cleddau Bridge to Little Castle Head
SMP 20 20.7
20.7 Gelliswick Bay to Sandy Haven east
LP_20_5.2
Engage with and encourage the landowner to set up a specific programme to monitor the risk of coastal erosion to the oil storage facility (20.3) and LNG terminals (20.3 and 20.7) as part of their risk assessment process.
Non-Strategic
Asset Management
Pembrokeshire
Pembrokeshire County Council
Not Yet Started
Proposed change in lead organisation to private asset/land owners.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 20 Cleddau Bridge to Little Castle Head
SMP 20 20.6
20.6 Gelliswick Bay
LP_20_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Pembrokeshire
Pembrokeshire County Council
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 21 Little Castle Head to St Ann's Head
SMP 20 21.3
21.3 Dale (Black Rock to Dale South)
LP_21_2.2
Undertake detailed studies, investigations and monitoring into feasibility of managed realignment policy at Dale, including social-economic assessment, assessment of impacts on the community and natural environment, consideration of location and extent of realignment and potential benefits with respect to the existing amenity beach. Community engagement will be undertaken to identify alternative coastal erosion and flood risk management options (including wide ranging adaptation options) and alternative funding options if it is not possible to justify public investment in coastal erosion and flood risk management.
Non-Strategic
Pembrokeshire
Pembrokeshire County Council
Not Yet Started
On Hold - delivery constraints on hold due to resource and delivery constraints.
20
20 - Lavernock Point to St Ann's Head
Policy Scenario Area 21 Little Castle Head to St Ann's Head
SMP 20 21.3
21.3 Dale (Black Rock to Dale South)
LP_21_7.4
Inform the local community, key stakeholders and general public about the change in epoch management policy for this area, and how the policy will be implemented.
Non-Strategic
Community Engagement
Pembrokeshire
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
All
LP_21_8.3
Promote the inclusion of the SMP policies and flood and coastal erosion risks in the next revisions of local development plans in order to help manage residual risks from coastal erosion and flooding to inform future planning decisions.
Strategic
Planning
Pembrokeshire
Pembrokeshire Coast National Park Authority
Progressing
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_HCR_01
Undertake an assessment to identify sites where Public Rights of Way interact with defences to inform and encourage forward planning where this is likely to become a constraint to policy implementation.
Strategic
Asset Management
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_HCR_02
Work with NRW to support the forecasting of habitat compensatory needs over the short to medium term. Consider and evaluate the potential benefits of in-situ restoration and habitat enhancement at a local level, to support wider Sustainable Management of Natural Resources and Wellbeing priorities.
Strategic
Habitat Creation
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_HCR_03
Undertake a high-level assessment to identify key areas where coastal erosion and sea level rise are likely to present a threat under the proposed SMP policy.
Strategic
Community Engagement
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_HCR_04
To contact and engage with private landowners, landowners/developers of industrial (and former industrial) sites, docks, ports, and harbours on a priority basis, to ensure that they are informed about the Shoreline Management Plan. This should also consider implications related to contamination risks where appropriate (4.1 Aberthaw; 8.5 Baglan Burrows; 12.11 Burry Port east (Tywyn Bach to the slipway); and areas identified within the NRW Landfill Report 2024). Additionally, where a management plan is in place or in production, ensure that the Shoreline Management Plan and Action Plan is updated accordingly.
Strategic
Asset Management
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_02
Promote a formal, policy, link between SMP2s and Local Development Frameworks/ Local Development Plans and Regional Plans. This will require WAG to review current arrangements.
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
WG
Progressing
SCBCEG (10/2022); Chair to continue to promote and engeage nationally via WCGF, as appropriate, and within group membership as LDPs are renewed.
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_03
Promote WG funding for all consultation/stakeholder activities in the development of SMP2s, and strategies/schemes.
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
WG
Progressing
SCBCEG (10/2022); Chair to continue to progress via WCGF and direct engagement with WG as and when required.
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_05
Promote the investigation, and implementation, of a broad range of mechanisms to facilitate the removal of �at risk� assets (properties, infrastructure, etc), to enable community adaptation to NAI or MR policies.
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
WG
Progressing
SCBCEG (10/2022); Action identified as group priority (2nd of 6). All members aware of priority action following action prioritisation workshop and issuing of recommendation report (May 2018) to all group members. Chair of group to promote nationally via WCGF and within group, particularly before SMP policy change process triggered by members. Good examples within group of implementation, most recently including the thorough consideration of coastal change and use of Coastal Change Management Areas within the Pembrokeshire Coast National Park Local Development Plan 2 (Sept 2020).
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_06
Develop exit strategies/management plans for the relocation of communities and removal of assets when they become at risk from erosion.
All
Local Authority
Progressing
SCBCEG (10/2022); No change since 2020. Several adopted or deposited LDPs contain policies facilitating adaptation in coastal change management areas. Individual authorities to develop strategies / management plans on a case by case basis.
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_07
Develop medium to long-term plans for relocation of community services and facilities that will be lost to erosion, e.g. outfalls, highways.
All
Service and Utility Providers, Highways Agencies
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_08
Develop and promote a communication strategy/ awareness raising/ education of the public with regards to potential future coastal erosion and flood risk issues and SMP2 recommendations.
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
NRW
On Hold
On hold - resource constraints SCBCEG (10/2022); Action identified as group priority (1st of 6) but limited progress to date. External specialist resources required and needs to link with WCGF communication plan.
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_09
Develop the existing strategic coastal monitoring programme to include the entire coast of the SMP2 including estuaries.
All
WCMC
Coastal Group - SCBCEG
Progressing
10/2020 SCBCEG; Wales National FCERM Strategy Measure 2 identifies WCMC and Coastal Groups as lead organisations. WCMC strategic monitoring ongoing but funding constraints preventing coverage of entire coastline including estuaries. Action was identified as a priority (6th of 6) in the 2018 SCBCEG lead action prioritisation workshop but further work required to identify areas where additional monitoring required and seek appropriate funding.
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_10
Undertake an assessment to holistically assess the risk of overtopping and undermining of existing defences across the SMP20 frontage.
Strategic
Asset Management
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_11
Collate all public coastal asset data into a single database to be accessed by all member organisations. Assess the quality and consistency of asset data collection across the SMP20 frontage.
Strategic
Asset Management
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_12
Collate all private coastal asset data into a single database to be accessed by all member organisations. Assess the quality and consistency of asset data collection across the SMP20 frontage.
Strategic
Asset Management
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_13
Undertake an assessment to identify key sites for cliff monitoring, the most appropriate method of monitoring, and funding mechanisms for monitoring.
Non-Strategic
Coastal Monitoring
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_MLT_14
Commission a broad-scale study into the coastal processess operating in the SMP20 area, including but not limited to the investigation of: Sediment regimes, sources, fluxes and transport pathways; Current velocities; Wind and wave regimes; Tidal regime; Rainfall; and River discharge, to enable a full understanding of the interactions between physical processes and coastal morphological change.
Non-Strategic
Coastal Monitoring
All
Coastal Group - SCBCEG
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Not Yet Started
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_SP_04
Inclusion of the SMP2 as reference material for, or an annex to, Local Development Plans
Non-Strategic
Planning
All
Local Authority
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
Progressing
SCBCEG (10/2022); Each LA referenced in LDP
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_SP_05
Promote the use of Strategic Flood Consequence Assessments as part of the preparation of development framework documents.
Non-Strategic
Strategy Work
All
Local Authority
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
NRW
Progressing
SCBCEG (10/2022); SFCAs in place or under development in all areas.
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_SP_06
Ensure that SMP2 policies are integrated into Development Control activities to control development and flood risk. Development Control Teams should pay particular attention to managed realignment and no active intervention policies and any associated drainage issues.
Non-Strategic
Planning
All
Local Authority
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
NRW
On Hold
Challenged - unclear action SCBCEG (10/2022); Action should be amended to promote
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_SP_07
Promote the development of planning policies to facilitate adaptation to coastal change and address potential housing and other future losses through implementation of �realignment� and �no active intervention� policies.
Non-Strategic
Adaptation/Resilience
All
Local Authority
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
NRW
On Hold
Challenged - lead partner incorrect PCNPA (10/2020) - Lead partner should be amended to Local Planning Authority to include Pembrokeshire Coast National Park Authority
20
20 - Lavernock Point to St Ann's Head
All
SMP 20
Lavernock Point to St Ann's Head
LP_SP_08
Promote the consideration of the relocation of land uses that are at risk from erosion or flooding, within the preparation of Local Development Plans. Identify elements of the preferred SMP2 policies where this may apply.
Strategic
Strategy Work
All
Local Authority
CR Moon Engineering Manager Environment 02920673277 crmoon@valeofglamorgan.gov.uk
NRW
On Hold
On hold - resource constraints SCBCEG (10/2022); Progressed in specific areas, for example Pembroke Coast LDP2.